Chandigarh: ₹16-cr Sukhna Choe bridge okayed, to do away with congestion, rain disruptions
Work on 500-metre long and 26.6-metre wide bridge to begin by July after 3 months of tendering process; project to connect Manimajra’s Shastri Nagar with Sector 26

Source: Hindustan Times
Work on 500-metre long and 26.6-metre wide bridge to begin by July after 3 months of tendering process; project to connect Manimajra’s Shastri Nagar with Sector 26